The Brazilian Navy (MB) will delay finalisation of its A-4BR Skyhawk upgrade programme from September 2015 to November 2017, according to a contract extension revealed at the end of November.
The first upgraded McDonnell Douglas A-4 Skyhawk (known locally as AF-1/A) was originally scheduled to be
↧